Automating Production Process Data Acquisition Towards Spaghetti Chart 4.0
作者:S. Al-Zubaidi, E. Coli, G. Fantoni · 发表于:International Journal of Industrial Engineering and Management · 年份:2022 · DOI:10.24867/ijiem-2022-3-308 · 被引用次数:8
[1] K. Hys, A. Domagała, “Application of spaghetti chart for production process streamlining. Case study”, Archives of Materials Science and Engineering, vol. 89, no. 2, pp. 64-71, 2018, doi: 10.5604/01.3001.0011.7173. [2] A. Cantini, F. De Carlo, and M. Tucci, “Towards Forklift Safety in a Warehouse: An Approach Based on the Automatic Analysis of Resource Flows,” Sustainability, vol. 12, no. 21, p. 8949, Oct. 2020, doi: 10.3390/su12218949. [3] J. Zhou and P. He, “Research on Data Acquistion System of Flow Workshop Based on IIoT, ” 2020 IEEE 3rd International Conference of Safe Production and Informatization (IICSPI), 2020, pp. 1-6, doi: 10.1109/IICSPI51290.2020.9332338. [4] E. Trunzer, A. Wullenweber, and B. Vogel-Heuser, “Graphical modeling notation for data collection and analysis architectures in cyber-physical systems of systems”, Journal of Industrial Information Integration, vol. 19, p. 100155, 2020, doi: 10.1016/j. jii.2020.100155. [5] G. Fantoni, S.Q. Al-Zubaidi, E. Coli, and D. Mazzei, “Automating the process of method-time-measurement,” International Journal of Productivity and Performance Management, vol. 70, no. 4, pp. 958-982, 2021, doi: https://doi.org/10.1108/IJPPM-08-2019-0404. [6] S.Q. Al-Zubaidi, G. Fantoni, F. Failli, and M. Frosolini, “Automated Method Time Measurement System for Redesigning Dynamic Facility Layout”, International Journal of Industrial and Manufacturing Engineering, vol. 15, no. 1, pp. 46-51, 2021. [7] S. Q. Al-Zubaidi, G. Fantoni, and F....