A Highly Parallel Integrated Process of Unloading, Exchanging, and Collecting for Rail-Changing
作者:Liqiang Fu, Hui Li, Yansong Shi, Zi Wang, C J Li, Qi Huang, Youshui Lu · 发表于:Vehicles · 年份:2026 · DOI:10.3390/vehicles8060117 · 研究领域:Railway Engineering and Dynamics、Railway Systems and Energy Efficiency、Transport and Economic Policies
Heavy-haul railways require efficient rail replacement because extreme axle loads and high-density transport accelerate rail wear. Traditional manual-led processes are limited by fragmented operations, high labor demand, and complex equipment scheduling, typically completing about 1 km of rail replacement within a 4 h maintenance window and requiring approximately 340 workers. This study is positioned as construction-process modeling, workflow organization, and simulation-supported feasibility analysis for an integrated rail-changing workflow, rather than the development or field validation of a fully mature rail-changing machine. The proposed workflow coordinates rail unloading, on-board welding, fastener disassembly, rail cutting, exchange-recovery, fastening, closure welding, and final inspection through a highly parallel construction organization. A process-level train-set configuration, including a tractor, a long-rail comprehensive transport vehicle, an exchange-recovery integrated transport vehicle, and a mobile welding vehicle, is used as an engineering carrier to support the closed-loop workflow of unloading, welding, exchange, and recovery. Based on engineering time-study analysis, field experience, expert consultation, and discrete-event simulation, the results indicate that the proposed workflow has the potential to complete a simulated 2 km rail-changing task within a single 4 h maintenance window with an estimated labor demand of 80–95 personnel under the specif...