Scholay

学术搜索 · AI 审稿 · LaTeX 协作

A new optimization method of initial support for TBM tunnel crossing fault zone based on deformation control contribution

作者:Peng Lin, Jintao Kang, Zhenhao Xu · 发表于:Bulletin of Engineering Geology and the Environment · 年份:2025 · DOI:10.1007/s10064-025-04122-4 · 被引用次数:5 · 研究领域:Tunneling and Rock Mechanics、Geotechnical Engineering and Analysis、Geotechnical Engineering and Underground Structures