Flash Flood Simulation for Hilly Reservoirs Considering Upstream Reservoirs—A Case Study of Moushan Reservoir
作者:Huaqing Zhao, Hao Wang, Yuxuan Zhang, Ranhang Zhao, Zhen Qi, Haodong Zhang · 发表于:Sustainability · 年份:2024 · DOI:10.3390/su16125001 · 被引用次数:4 · 研究领域:Hydrology and Watershed Management Studies、Flood Risk Assessment and Management、Hydrology and Drought Analysis
With the advancement of society and the impact of various factors such as climate change, surface conditions, and human activities, there has been a significant increase in the frequency of extreme rainfall events, leading to substantial losses from flood disasters. The presence of numerous small and medium-sized water conservancy projects in the basin plays a crucial role in influencing runoff production and rainwater confluence. However, due to the lack of extensive historical hydrological data for simulation purposes, it is challenging to accurately predict floods in the basin. Therefore, there is a growing emphasis on flood simulation and forecasting that takes into account the influence of upstream water projects. Moushan Reservoir basin is located in a hilly area of an arid and semi-arid region in the north of China. Flooding has the characteristics of sudden strong, short confluence time, steep rise, and steep fall, especially floods caused by extreme weather events, which have a high frequency and a wide range of hazards, and has become one of the most threatening natural disasters to human life and property safety. There are many small and medium-sized reservoirs in this basin, which have a significant influence on the accuracy of flood prediction. Therefore, taking Moushan Reservoir as an example, this paper puts forward a flash flood simulation method for reservoirs in hilly areas, considering upstream reservoirs, which can better solve the problem of flood simulat...