Collaborative scheduling of energy-saving spare parts manufacturing and equipment operation strategy using a self-adaptive two-stage memetic algorithm
作者:Qiang Luo, Qianwang Deng, Huining Zhuang, Guiliang Gong, Qing Fan, Xiahui Liu · 发表于:Robotics and Computer-Integrated Manufacturing · 年份:2023 · DOI:10.1016/j.rcim.2023.102707 · 被引用次数:17 · 研究领域:Scheduling and Optimization Algorithms、Advanced Multi-Objective Optimization Algorithms、Supply Chain and Inventory Management