Applied research of comprehensive advance geological prediction in Daluoshan water diversion tunnel
作者:Mingqing Liu, Qinyu Gan · 发表于:Scientific Reports · 年份:2023 · DOI:10.1038/s41598-023-36090-8 · 被引用次数:15 · 研究领域:Tunneling and Rock Mechanics、Geophysical Methods and Applications、Geotechnical Engineering and Underground Structures
In order to study the accuracy of comprehensive advanced geological prediction methods in tunnel construction projects, this paper takes the Daluoshan Water Diversion Tunnel Project in Wenzhou, Zhejiang Province as the basis of the project, selects a typical section of the water diversion tunnel, and uses Tunnel Seismic Tomography and Ground Penetrating Radar to transmit seismic and electromagnetic waves to the surrounding rock face of the tunnel, and process and interpret the collected signal information. Advanced borehole and drilling techniques are used for verification. The results show that the geological prediction results are consistent with the actual revealed conditions, and the advantages of various technologies can be exerted and mutually verified through advanced geological prediction, which can significantly improve the accuracy of advanced geological prediction in the application of water diversion tunnels and provide reference and basis for later construction, and provide safety assurance.