Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing
作者:Zhiyun Deng, Xinrong Liu, Xiaohan Zhou, Qinghui Yang, Peng Chen, Albert de la Fuente, Lianxi Ren, Libing Du, Yafeng Han, Fei Xiong, Ru Yan · 发表于:Tunnelling and Underground Space Technology · 年份:2022 · DOI:10.1016/j.tust.2022.104420 · 被引用次数:54 · 研究领域:Grouting, Rheology, and Soil Mechanics、Geotechnical Engineering and Underground Structures、Geophysical Methods and Applications