Commercialization and Fleet Experience of the 7/9HA Gas Turbine Combined Cycle
作者:Christian Vandervort, David C. Leach, David Walker, Jerry Sasser · 年份:2019 · DOI:10.1115/gt2019-91594 · 被引用次数:8 · 研究领域:Advanced Power Generation Technologies、Oil, Gas, and Environmental Issues、Technical Engine Diagnostics and Monitoring
Abstract The power generation industry is facing unprecedented challenges. High fuel costs and increased penetration of renewable power have resulted in greater demand for high efficiency and operational flexibility. Imperatives to reduce carbon footprint place an even higher premium on efficiency. Power producers are seeking highly efficient, reliable, and operationally flexible solutions that provide long-term profitability in a volatile environment. New generation must also be cost-effective to ensure affordability for both domestic and industrial consumers. Gas turbine combined cycle power plants meet these requirements by providing reliable, dispatchable generation with a low cost of electricity, reduced environmental impact, and broad operational flexibility. Start times for large, industrial gas turbine combined cycles are less than 30 minutes from turning gear to full load, with ramp rates from 60 to 88 MW/minute. GE introduced the 7/9HA industrial gas turbine product portfolio in 2014 in response to these demands. These air-cooled, H-class gas turbines (7/9HA) are engineered to achieve greater than 63% net combined cycle efficiency while delivering operational flexibility through deep, emission-compliant turndown and high ramp rates. The largest of these gas turbines, the 9HA.02, is designed to exceed 64% combined cycle efficiency (net, ISO) in a 1×1, single-shaft (SS) configuration. As of December 2018, a total of 32 7/9HA power plants have achieved COD (Commercial ...