Innovative Method for the Construction of Cable-Stayed Bridges by Cable Crane
作者:Xiangmin Yu, De‐Wei Chen · 发表于:Structural Engineering International · 年份:2018 · DOI:10.1080/10168664.2018.1459223 · 被引用次数:8 · 研究领域:Structural Engineering and Vibration Analysis、Railway Engineering and Dynamics、Mechanical stress and fatigue analysis
Yachihe Bridge in China is a hybrid cable-stayed bridge with concrete decks at the side spans and a steel truss deck at the mid-span. The 800-m-long truss deck breaks a new record as the longest steel truss cable-stayed bridge in the world. Constrained by site terrain, poor transportation conditions and limited time, a cable crane was adopted for the erection of the 16-m-long truss deck segments, marking the first time that a cable crane has been used in the deck erection of a cable-stayed bridge. This paper primarily deals with the challenges faced and solutions formulated during the bridge construction process, and also presents field load tests for the cable crane.