PROCEDURE AND ALGORITHM FOR CONSTRUCTION PLANNING AND SCHEDULING : Construction planning and scheduling with construction process Chart 1

作者:Yukio OSAWA, Naruo Kano · 发表于:Journal of Architecture and Planning (Transactions of AIJ) · 年份:1997 · DOI:10.3130/aija.62.207_1 · 被引用次数:1 · 研究领域:Resource-Constrained Project Scheduling、Construction Project Management and Performance、BIM and Construction Integration

In connection with the detailed planning and scheduling for construction process, we studied characteristics of construction process, and pointed out required items of planning and scheduling procedure. This paper proposed new systematical methods based on "Construction Process Chart" to make appropriate representation of detailed planning of construction process. In addition, these methods clear the sequence of Works, job-sites, resources, then solve resource levelling and term shortening problems o, n a construction project. The proposed methods have procedures for representing construction works into detailed process, and adapted to the practical works, which proved that methods would greatly contribute to the successful usage of construction planning phase.